The work to be performed under this contract shall consist of providing detailed engineering and geotechnical investigation required for the detailed design and preparation of construction documents for the construction of three low water crossings and associated road improvements on S. Hausman Road from approximately 400 feet north of Braefield to Paloma Creek Street.

Project Status

Project is under construction.

05/21/19 Update:  The design for this project is 100% complete.

09/19/19: Pre-Construction Public Meeting was held at Steubing Elementary School.

Project Status

Document

Project Documents

Previous Meetings

  • March 26, 2015: South Hausman Community Meeting
  • September 19, 2019: South Hausman Pre-Construction Public Meeting