Real Road Low Water Crossing

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Scope

This project will replace the existing low water crossing at Real Road and Chupaderas Creek with a structure capable of passing a 1-percent -chance (100 year) storm without overtopping the road. In addition, Real Road will be reconstructed, ditches along Real Road will be re-graded, the channels upstream and downstream will be re-graded and utilities relocated as needed.

Project Status

Project Status is Complete

Previous Meetings

  • November 1, 2012: Kirkner Road & Real Road Community Meeting